Delta — money left on the table €26 188
Fee Audit — Stage 1

Minkiö Railway Museum

Scale: N.T.S. Basis: SAFA-style schedule Rev: A

1Project Basis

Building Area
Construction Cost per m²
Total Construction Cost €4 875 000

2Expected Fee Schedule

Architect Fee — Stage 1 0.9 – 1.2% €43 875 – €58 500
Full Architect Fee 5.6 – 7.9% €273 000 – €385 125
Full Design Team Fee 10.0 – 14.2% €487 500 – €692 250

3Their Stage 1 Offer — Reality Check

Their Offer for Stage 1

What it should cost

Normal Stage 1 fee (midpoint, 1.05%)
€51 188
Basis used
1 625 m² @ 3 000 €/m²

What their offer really means

Implied construction cost
€2 380 952
Implied rate per m²
1 465 €/m²
49%
of the normal Stage 1 fee — lowball territory
0%60%85%110%150%
Standard rate
3 000 €/m²
Implied by offer
1 465 €/m²
To justify an offer of €25 000, the design team would have to be pricing this building as if it cost 1 465 €/m² to build — not the 3 000 €/m² you've actually budgeted. That's a project priced as if it were roughly half the building it actually is.

4Claw-back Proposal

Delta (normal fee − their offer) €26 188
Claw-back share of delta, if bid is won %

Now — Stage 1 submission

You bid at their offer
€25 000

If the bid succeeds

Claw-back amount
€13 094
Effective total Stage 1 fee
€38 094
Pitch: take the €25 000 offer through to bid submission. If the bid succeeds, claw back 50% of the €26 188 delta — €13 094 — bringing the effective Stage 1 fee to €38 094, or 74% of the normal rate.